At its Sept. 27 meeting, the Sound Transit Board decided to advance the NE 130th Street Station into preliminary engineering (PE). Originally scheduled to open in 2031 as an infill station along the Lynnwood Link Extension alignment, the Board directed staff to advance to PE to determine if the station can be sufficiently built […]