I finally learned how to convert .pdf files to .jpg. Here is the likely Jackson Park Trail route. Also, I have spoken with Tim Gallagher, Director of Seattle Parks and Recreation, since this last post. And, Tim is optimistic that a full perimeter trail can be built and that it will have a modest (under $1 M) cost.
Leave a Reply